The Advantage of Steel Fibers in Shotcrete
TenaBrix® fibers for Shotcrete that complies with ASTM C 1116, Standard Specification for Fiber-Reinforced Shotcrete, and are specifically used to control and mitigate plastic shrinkage cracking, increase surface durability, impact, and abrasion resistance.
TenaBrix® products including macro/micro synthetic fibers provide three-dimensional reinforcement for both above-ground and below ground applications.
Scope of application
Tunnel initial support, slope support, mine tunnel, building reinforcement and other wet/dry spraying concrete projects.
 
															 
															 
															 
															Recommended amount of steel fiber added
| 
                                Type                             | 
                                Recommended Addition Amount                             | 
                                Fiber Specification Recommendations                             | 
|---|---|---|
| Primary tunnel support | 25~40 kg/m³ | Length 30~35mm, Diameter 0.5~0.75mm | 
| Thin layer repair (<100mm) | 35-45 kg/m³ | Length 25~30mm | 
| High-impact construction | 40-60 kg/m³ | Length 35~50mm, End Hook Type | 
The specific dosage should be verified by trial mixing to meet the requirements of flexural toughness of “steel fiber concrete” (JG/T 472).
Recommended Other Fiber
FAQ
Exposed fibers on the surface of the spray coat
                Reason:Improper spraying angle or troweling after final set.
Solution:Adjustment of gun angle; calendering before initial setting
        Solution:Adjustment of gun angle; calendering before initial setting
Frequent clogging of pipes
                Reason:Fiber clumping or too low a sand ratio.
Solution:Enhance fiber dispersion; increase sand rate 2%~3%
        Solution:Enhance fiber dispersion; increase sand rate 2%~3%
Early cracking
                Reason:Uneven fiber distribution or insufficient maintenance.
Solution:Optimize mixing process; cover and maintain within 6h after spraying
        Solution:Optimize mixing process; cover and maintain within 6h after spraying
Intensity fluctuation >15%
                Reason:Metering deviation or uncontrolled water-cement ratio.
Solution:Calibrated fiber scale; strict water control
        Solution:Calibrated fiber scale; strict water control
 